[easy-social-share counters=0 style="icon" point_type="simple"]

June 01, 2007

BRT Planning Guide Sample Operator Contract and Infrastructure Cost Calculator

Within the BRT Planning Guide, a template operational contract is provided based upon the Phase II contract for  trunk services in the Bogotá TransMilenio system. The template provides the outline of the original contract. Here is provided the complete contract, at 183 pages in length with significant technical detail.

The BRT infrastrcuture cost calculator assists planners in assessing  the various costs associated with construction of a new BRT system.

1b. Screen Shot 2014-01-02 at 3.35.56 PM
Sample Operator Contract
Download this document
Source: ITDP

1b. Screen Shot 2014-01-02 at 3.35.56 PM
Infrastructure Cost Calculator
Download this document
Source: ITDP

Subscribe

Sign up for updates on our projects, events and publications.

SIGN UP